Integrated Nanosystems Research Facility

Facilities Management will be conducting leak checks on the compressed air system this Saturday (06/24). This will affect some of tools in the lab so please plan accordingly.

All INRF and BiON Users,

Reminder: Both INRF and BiON lab entrances are now done through the Forged System via Chrome

All equipment in both the INRF and BiON are also now operated through the Forged System via Chrome.

*There should be no more instances of the past Legacy System in operation, either for tools or for Lab Log in.

Please do NOT start playing around with netbooks or computers looking for the Legacy System or changing computer settings.

Please do NOT access the Latch System.

Please do NOT modify hardware (cables, latch boxes, etc).

Please only use the Chrome browser and the Forged website on lab computers and netbooks.

Everything is now universally done through the Forged System via Chrome.

If you have an issue with Forged system operation, please first check that your User Profile is fully complete, updated, and accurate. Then once that is verified contact staff for assistance vs. trying to change things yourself.

While we’re on the topic of Forged: Occasionally there may be rare internet disconnects (none have been reported today), and may find a computer with the internet disconnected logo shown below.

If you find that this is the case, please Right Click on the wireless and “Disconnect”. After waiting a few seconds, you can Right Click again and “Connect”.

Starting May 1st the STS will be down for maintenance for a week. Please plan accordingly

Reminder: Check the Forged Systems Equipment Status page for latest tool updates and info

It should be back up Wednesday. Please check the Forged System equipment status page for updates.

TSS is here re-certifying the benches in the wet process room and they will be off limits until they are complete. They should be completed by 12pm tomorrow.

OUTAGE NOTIFICATION

Location: Calit2 (BION)

Outage: Compressed Air – Fume Hoods – Supply and Return Air – Indoor Temperature Control – Process Chilled Water

Date(s): Wednesday, January 4th, 2017

Duration: Scheduled to begin at 5:00 am and last for approximately 2 hours, ending at approximately 7:00 am.

Details: Facilities Management will be installing Compressed Air Flowmeters. During this time, the compressed air, temperature controls, fume hoods, supply and return air and process cooling will be affected.

Please secure fume hoods and remove all light materials. During this time, please do not use the fume hoods.

OUTAGE NOTIFICATION

Location: Calit2 (BION)

Outage: Compressed Air – Fume Hoods – Supply and Return Air – Indoor Temperature Control – Process Chilled Water

Date(s): Wednesday, January 4th, 2017

Duration: Scheduled to begin at 5:00 am and last for approximately 2 hours, ending at approximately 7:00 am.

Details: Facilities Management will be installing Compressed Air Flowmeters. During this time, the compressed air, temperature controls, fume hoods, supply and return air and process cooling will be affected.

Please secure fume hoods and remove all light materials. During this time, please do not use the fume hoods.

Facilities will be doing their annual DI water maintenance on both the INRF & BION cleanrooms next week. Anything that uses Di will be affected so plan accordingly.

BION: Monday & Tuesday (12-13th)

INRF: Thursday & Friday (15-16th)

The MA6 will be taken offline this Monday to change out the lamp and should be back up on Tuesday.

The Dicing Saw will be down until further notice. The spindle was galled therefor the shaft needs to be removed and sent out for repair. We will notify you when we get more info. Please to not ask staff. Thanks