The pump for the STS tripped out this morning due to high chillwater temps. We are going to use this time to complete some much needed maintenance on the equipment. We have no estimate at this time as to when it will be back up. We will let you know ASAP.

The Ebeam 1 is now back online. Thank you for your patience.

INRF Staff

The Ebeam1 will be taken off line tonight for a cryo regen. We will send out a post when it is back up on Thursday.

The Mark 50 will be down a little big longer than anticipated for a more thorough cleaning and we will hopefully have it back up by mid next week. We will let you know once its back up.

The Mark 50 will be down for maintenance until Monday (04/27).

The BiON will be closed:

• Friday (03/20) between 7-8am
• Saturday (03/21) All Day
• Sunday (03/22) All Day

Facilities will be performing exhaust maintenance this weekend therefor the BION cleanroom will be closed.

NOTE: There will also be a High Temp water shutdown in both facilities this weekend so there will be no heat in the buildings.

Facilities will be working on the roof at Calit2 again this Saturday. This will effect the hoods in the BION. We apologize for the inconvenience.

Ebeam 1 will be down tomorrow (01/28)

Mark 50 will be down Next Tuesday (02/05)

Facilities will be replacing the UPS on the Siemens panel on the roof starting around 7:30 – 8 am. This panel controls the make-up air handlers and the exhaust fans. This should take no longer than 2hrs. If you are in during this time just be cautious.