Cleanrooms will open with limited functionality during these times.
CaliT2 (BION):
- Details: DI System sanitation only
- Schedule: 6:00am Monday, 12/15/14 – 5:00pm Tuesday, 12/16/14
Engineering Gateway (INRF):
- Details: The DI equipment will be replaced with new equipment and the system will be sanitized.
- Schedule: 6:00am Wednesday, 12/17/14 – 5:00pm Friday, 12/19/14