Integrated Nanosystems Research Facility

We will be working on the Plasma therm RIE chamber to repair turbo pump
for low pressure process. Also cleaning the chamber. System will be back
online July 12th.
The K & S 780 dicing saw is down due to a cooling water leak in the sample
chuck which needs to be disassembled and repaired. System should be back
online July 15th.