Integrated Nanosystems Research Facility

The INRF and BION will feel extra cold today due to a failure in campus high temp water system. If you think your projects will be effected please hold off intil this is resolved. We do not know when it will be back up. Below is the message from Facilities:

“At 1:30am, June 15, 2015, there was a failure on the high temp hot water loop to the campus. The entire system has been isolated. The systems affected during the shutdown include: building heat, industrial & domestic hot water, and steam generation for cage washers and autoclaves.

We are working to identify the failure and make the necessary repairs to bring the system back in service. We will send updates as information becomes available.”