Integrated Nanosystems Research Facility

From Facilities:

This morning’s repair work on the industrial water system at Engineering Gateway revealed the immediate need to replace a main water valve.  As a result, all water will be shutdown to Engineering Gateway until approximately 11am this morning.  I will provide additional updates as I receive them.