Integrated Nanosystems Research Facility

Facilities Management has scheduled a high temperature hot water shutdown which will affect most of Engineering.  Shutdown details:

  • Shutdown 5pm, Friday, September 13
  • Service restoration no later than 11:30am, Sunday, September 15
  • Shutdown will affect building heat, industrial hot water and steam generation for cage washers and autoclaves

Engineering spaces affected:

  • Engineering Gateway
  • Engineering Hall
  • Engineering Laboratory Facility
  • Engineering Tower
  • Multipurpose Science & Technology Building
  • Natural Sciences II
  • Rockwell Engineering Center

Occupants may notice cooler than normal building temperatures during the shutdown.