Integrated Nanosystems Research Facility

The e-beam evaporator is somewhat functional but the cylinoid valve assembly that operates the high vac is only operating correctly in one direction (the opening direction).

Users are required to have staff help them close the high vac valve so please check with staff before operating the tool.

Thanks,
INRF/BION Staff