Integrated Nanosystems Research Facility

INRF and BION Orientation Quiz

Please fill out your name and email to begin the Quiz. The results of the quiz will be emailed to you and INRF.

Name Email
Where do you check the status of the equipment?
If you do not access the facility within ___ days, accessibility will be denied.
Which of the following are required when setting up a Forged system profile?
In case of Emergency what is the best first phone number to call
Chemicals belonging to individuals need to be properly labelled and dated in ___ intervals:
How do you request training on specific equipment and when does training typically occur?
Users can do which of the following with regards to gas cylinders:
If you will be working with chemicals and and will need access to the wet processing areas in
the INRF or BION, you are required to submit the Chemical Usage Form
Only INRF Staff are allowed to make adjustments and repairs to equipment, use compressed
gasses, and handle chemical wastes.
Which is the best statement below:
The Forged system is OPTIONAL.
The INRF has a YouTube channel and is an excellent resource (and videos are often required) for lab and equipment training.
What must users do when operating equipment in the facility?
The INRF and BION are shared user facilities, and as such should be treated with that in mind
always:
Any outside chemicals/materials being brought into the lab must be approved by Staff.
The designated evacuation assembly point is:
When evacuating the lab due to emergencies
In use chemical forms are required to identify chemicals that are presently being used except if only leaving the room to use the restroom, make a phone call, or grab a quick drink/meal.
Reading the Forged System SOPs is a required part of Orientation.
If you do not access the tool within the time limit specified on the Equipment page of the INRF website (90-180 days, and it varies per equipment) access will be denied.
All users are required to clean up after themselves except:
The Policy Compliance Agreement document must be completed prior to entering the lab facilities
We require all staff and users to take safety training and pass certification before using
equipment?
To use a piece of equipment in the facility, users must first be authorized by staff on that specific piece of equipment.
Select the best option below:
Which of the following are NOT done through the Forged System?
Where are SDS (safety data sheets) available for viewing?
If you want to find out how to do something on the Forged system, you should: